Effect of Project Risk Management on the Success of the Itunda-Busanza Road Construction Project in Kicukiro District, Rwanda
DOI:
https://doi.org/10.51867/AQSSR.2.1.21Keywords:
Project Success, Risk Management, Risk Identification, Risk Analysis, Risk Response, Risk Monitoring and EvaluationAbstract
This study is about the effect of risk management on project success, and it used the Itunda-Busanza road construction project in Kicukiro district, Rwanda as a case study. The study was guided by the theory of change, the game theory and the prospect theory. The study population was 10,012 and using the Taro Yamane formula, the sample size used in this study was 384 respondents which included the project manager, risk officer, project team members and beneficiaries. The tools of data collection used were the documentations from relevant sources, questionnaires and interviews. This research used a descriptive and correlational research design. Quantitative data obtained from structured questionnaires and qualitative data was obtained through documentation and semi-structured interviews with relevant authorities involved in the project. Data analysis was carried out using the statistical software SPSS. Descriptive statistics such as mean and standard deviation were used to summarise the data obtained and inferential statistics such as the Pearson’s Correlation, ANOVA, coefficients test and Multiple Linear Regression. Fisher (F) and P-values were used to test the null hypotheses. In this study, thematic analysis was used to analyse qualitative data. The study findings revealed the R value to be 0.986 which indicates a strong positive relationship between predictor and the dependent variable. The R square value of 0.972 shows that 97.2% of the variability in the outcome variable can be explained by the predictors. The coefficient of the predictors indicate effect on project success. Specifically Risk Identification (β1=0.666, p=0.00), Risk Analysis (β2=0.089, p=0.035) Risk Response (β3=0.141, p=0.002) and Risk Monitoring and Evaluation (β4=0.098, p=0.03). This indicates that all the coefficients of the predictors are statistically significant, as indicated by their associated significant values below 0.05. This explains that all four null hypotheses were tested and rejected to accept the alternative hypotheses. The study concluded that all the independent variables of the model specification had the greatest effect on the success of the Itunda-Busanza road construction project in Kicukiro district, Rwanda. The study recommends the practices of Risk Management which involve Risk Identification, Risk Analysis, Risk Response and Risk monitoring and Evaluation to promote project success in all construction projects.
References
Aikpokhio, B., Gambo, N., Ogedengbe, F., & Nwoye, M. (2024). Risk management practices and performance of construction projects: Evidence from selected estate management companies in FCT Abuja. European Journal of Logistics, Purchasing and Supply Chain Management, 12(1), 1-19. https://doi.org/10.37745/ejlpscm.2013/vol12n1119 DOI: https://doi.org/10.37745/ejlpscm.2013/vol12n1119
Al Mhirat, M., & Irtemeh, J. H. (2017). The impact of risk management on project success: An empirical investigation in Jordanian Ministry of Environment. European Journal of Business and Management, 9(19), 56-61.
Alberts, R., Retief, F., Roos, C., Cilliers, D., & Arakele, M. (2020). Re-thinking the fundamentals of EIA through the identification of key assumptions for evaluation. Impact Assessment and Project Appraisal, 38(3), 205-213.
https://doi.org/10.1080/14615517.2019.1676069 DOI: https://doi.org/10.1080/14615517.2019.1676069
Aldeen, M., & Sarhan, N. (2024). The impact of risk management on project success: A field study at humanitarian organisations in Yemen. University of Science and Technology Journal for Management and Human Sciences, 2(3), 131-156. https://doi.org/10.59222/ustjmhs.2.3.5 DOI: https://doi.org/10.59222/ustjmhs.2.3.5
Amoah, C., & Pretorius, L. (2019). Evaluation of the impact of risk management on project performance in small construction firms in South Africa: The case study of construction systems. Journal of Engineering, Design and Technology, 18(3), 611-634. https://doi.org/10.1108/JEDT-06-2018-0098 DOI: https://doi.org/10.1108/JEDT-06-2018-0098
Aven, T., & Flag, R. (2020). Foundational challenges for advancing the field and discipline of risk analysis. Risk Analysis: An International Journal, 40(S1), 2128-2136. https://doi.org/10.1111/risa.13496 DOI: https://doi.org/10.1111/risa.13496
Boampong, B. (2021). The impact of risk management on project success: A case study of the land administration project Ghana. University of Bradford Open Access Repository. https://bradscholars.brad.ac.uk/server/api/core/bitstreams/2e90f881-c710-4b23-9307-486bebdfcfdd/content
Chattapadhyay, D., Putta, J., & Rap, P. P. (2021). Risk identification, assessments, and prediction for mega construction projects: A risk prediction paradigm based on cross analytical-machine learning model. Building, 11(4), 172.
https://doi.org/10.3390/buildings11040172 DOI: https://doi.org/10.3390/buildings11040172
Ekung, S., & Adu, E. (2020). Limitations of risk identification tools applied in project management in the Nigerian construction industry. Malaysian Construction Research Journal, 30(1), 73-85.
Gitau, L. M. (2015). The effects of risk management at project planning phase on performance of construction projects in Rwanda (Thesis, Jomo Kenyatta University of Agriculture and Technology).
Hans, R., & Mnkandla, E. (2019). To what extent do South African software organisations lack project success factors? 2019 International Conference on Contemporary Computing and Informatics (IC3I), Singapore, 211-216.
https://doi.org/10.1109/IC3I46837.2019.9055512 DOI: https://doi.org/10.1109/IC3I46837.2019.9055512
Igihozo, L., & Irechukwu, E. (2022). Project risk management process and performance of Mpazi channel construction project in Nyabugogo, Kigali-Rwanda. Journal of Strategic Management, 6(2), 31-44.
https://doi.org/10.53819/81018102t2047 DOI: https://doi.org/10.53819/81018102t2047
Ika, L., & Pinto, J. (2022). The "re-meaning" of project success: Updating and recalibrating for a modern project management. International Journal of Project Management, 41(1), 102-432. DOI: https://doi.org/10.1016/j.ijproman.2022.11.005
https://doi.org/10.1016/j.ijproman.2022.08.001 DOI: https://doi.org/10.1016/j.ijproman.2022.08.001
Kahneman, D., & Tversky, A. (1979). Prospect theory: An analysis of decision under risk. Econometrica, 47(2), 263-291.
https://doi.org/10.2307/1914185 DOI: https://doi.org/10.2307/1914185
Masimbi, M. (2023). Operational risk management and project success in Rwanda: A case study of Lake Victoria Water and Sanitation Project (LVWATSAN) in Nyagatare District, Rwanda. Journal of Entrepreneurship and Project Management, 7(14), 110-120. https://doi.org/10.53819/81018102t4226 DOI: https://doi.org/10.53819/81018102t4226
Muktar, A., Muhamad, A., & Noraini, H. (2020). Assessment of the effect of external risk factors on the success of an oil and gas construction project. Journal of Engineering Construction and Architectural Management, 29(9), 2767-2793.
https://doi.org/10.1108/ECAM-10-2019-0573 DOI: https://doi.org/10.1108/ECAM-10-2019-0573
Perc, M., Jordan, J., Rand, G., Wang, Z., Boccaletti, S., & Szolnoki, A. (2017). Statistical physics of human cooperation. Physics Reports, 687, 1-51. https://doi.org/10.1016/j.physrep.2017.05.004 DOI: https://doi.org/10.1016/j.physrep.2017.05.004
Piraveenan, M. (2019). Applications of game theory in project management: A structured review and analysis. Mathematics, 7(9), 1-31. https://doi.org/10.3390/math7090858 DOI: https://doi.org/10.3390/math7090858
Reinholz, D., & Andrews, C. (2020). Change theory and theory of change: What's the difference anyway? International Journal of STEM Education, 7(2), 1-12. https://doi.org/10.1186/s40594-020-0202-3 DOI: https://doi.org/10.1186/s40594-020-0202-3
Simon, O., & Mutiso, J. (2021). Influence of project risk management on performance of agricultural projects in Nakuru County, Kenya. International Research Journal of Business and Strategic Management, 2(2), 371-387.
Taylor, Z. (2024). Behavioral finance: Investor psychology and market outcomes. International Journal of Finance, 9(4), 21-34. https://doi.org/10.47941/ijf.2113 DOI: https://doi.org/10.47941/ijf.2113
Tesfaye, R. (2022). The role of project risk management practices for project success: The case of projects in NIB International Bank. St. Mary's University Institutional Repository. http://www.repository.smuc.edu.et/bitstream/123456789/7262/1/The_Role_of_Project_Risk_Management_Practices_for_Project_Success.pdf
Vujović, V., Denić, N., Stevanović, V., Stevanović, M., Stojanović, J., Cao, Y., Alhammadi, Y., Jermsittiparsert, K., Van Le, H., Wakil, K., & Radojković, I. (2020). Project planning and risk management as a success factor for agricultural schools in Serbia. Technology in Society, 63(2), 101371. https://doi.org/10.1016/j.techsoc.2020.101371 DOI: https://doi.org/10.1016/j.techsoc.2020.101371
Zhang, Y., Zuo, F., & Guan, X. (2020). Integrating case-based analysis and fuzzy optimization for selecting project risk response actions. Physica A: Statistical Mechanics and Its Applications, 545(C), 123578. https://doi.org/10.1016/j.physa.2019.123578 DOI: https://doi.org/10.1016/j.physa.2019.123578
Downloads
Published
Issue
Section
License
Copyright (c) 2025 African Quarterly Social Science Review

This work is licensed under a Creative Commons Attribution-NonCommercial 4.0 International License.