Effect of monitoring and evaluation practices on performance of projects. A case of Rugano Mushubi -Peru water supply system project in Nyamagabe District, Rwanda
DOI :
https://doi.org/10.51867/AQSSR.3.3.94Mots-clés :
Evidence-Based Management, Infrastructure Development, Monitoring and Evaluation Practices, Project Performance, Rwanda, Water Supply SystemsRésumé
Despite infrastructure expansion, intermittent water supply remains a challenge in many developing contexts, with some communities receiving water for only a few hours per day. Such inconsistencies undermine the effectiveness and sustainability of water supply projects, where reliability is a key measure of performance. This study examined the effect of monitoring and evaluation (M&E) practices on the performance of the Rugano–Mushubi–Peru Water Supply System Project in Nyamagabe District, Rwanda. Specifically, the study assessed the influence of M&E planning, capacity building, data collection, and reporting on project performance. The study was guided by Systems Theory, Human Capital Theory, Resource-Based View Theory, and Theory of Change. A descriptive correlational research design was adopted using a quantitative approach. The target population comprised 344 respondents, and a sample of 185 respondents was determined using Cochran’s formula and selected through simple random sampling. Data were collected using structured questionnaires and interviews and analyzed using SPSS through descriptive statistics, Pearson correlation, and multiple regression analysis. The findings revealed that M&E practices significantly influenced project performance. Specifically, M&E planning (B = 0.224, p < 0.001), capacity building (B = 0.312, p < 0.001), data collection (B = 0.251, p < 0.001), and reporting (B = 0.313, p < 0.001) had positive and significant effects on project performance. The study concluded that effective M&E practices strengthen project planning, staff capacity, evidence generation, accountability, and implementation control, thereby improving water supply project performance. The study recommends strengthening institutionalized M&E systems through clear monitoring schedules, continuous capacity development, reliable data systems, and effective reporting mechanisms to enhance sustainability and service delivery in water supply projects.
Références
Aal, E. B. W. (2025). The elephant actually talks: Project organisation from a communication perspective. International Journal of Project Management, 43(6), 102750. https://doi.org/10.1016/j.ijproman.2025.102750
Anderson, A. A. (2005). The community builder's approach to theory of change: A practical guide to theory development. The Aspen Institute.
Barney, J. (1991). Firm resources and sustained competitive advantage. Journal of Management, 17(1), 99-120. https://doi.org/10.1177/014920639101700108
Becker, G. S. (1964). Human capital: A theoretical and empirical analysis, with special reference to education. Columbia University Press.
Celestin, M. (2019). Impact of project management practices on contractor performance in Rwanda's local government sector. International Journal of Computational Research and Development (IJCRD), 4(2), 38-45.
Cochran, W. G. (1977). Sampling techniques (3rd ed.). John Wiley & Sons.
Creswell, J. W., & Creswell, J. D. (2023). Research design: Qualitative, quantitative, and mixed methods approaches (6th ed.). SAGE Publications.
García-Sánchez, I. M., Núñez-Torrado, M., Aibar-Guzmán, C., & Aibar-Guzmán, B. (2025). Beyond climate targets: Exploring when and how female directors influence corporate decarbonization transparency. Business Strategy and the Environment, 34(3), 3892-3912.
https://doi.org/10.1002/bse.4183
Görgens, M., & Kusek, J. Z. (2009). Making monitoring and evaluation systems work: A capacity development toolkit. World Bank.
https://doi.org/10.1596/978-0-8213-8186-1
Hussain, M. M., Din, A. U., & Farooq, S. H. (2026). Adaptive monitoring in sustainable project management: The roles of organizational agility and stakeholder engagement. Business & Economic Review, 18(1), 111-140.
https://doi.org/10.22547/BER/18.1.5
Ishimwe, C. N., & Gachiri, W. (2025). Effect of monitoring and evaluation practices on project performance in Rwanda: A case of transforming Eastern Province through adaptation project in Eastern Province (2021-2024). Journal of Research Innovation and Implications in Education, 9(2), 478-488. https://doi.org/10.59765/vxyr47v
Jalil, S. I. (2024). Impact of monitoring and evaluation practices on project performance. SZABIST International Journal of Management Sciences, 1(2), 1-17.
Kanyi, J. K., & James, R. (2023). Capacity building and performance of donor-funded projects in Nairobi City County, Kenya. International Journal of Business and Management, 18(2), 61-61. https://doi.org/10.5539/ijbm.v18n2p61
Kimatu, F. N., & Musembi, A. K. (2024). Monitoring and evaluation management practices and performance of community water projects in Machakos County, Kenya. International Journal of Social Sciences Management and Entrepreneurship, 8(3).
Kimote, J., & Muchai, S. K. (2024). Assessing approaches to strengthen monitoring and evaluation in development projects: Evidence from donor-funded projects in Machakos County, Kenya. African Journal of Empirical Research, 5(2), 598-607.
https://doi.org/10.51867/ajernet.5.2.53
Kusek, J. Z., & Rist, R. C. (2004). Ten steps to a results-based monitoring and evaluation system: A handbook for development practitioners. World Bank.
Leiringer, R., & Zhang, S. (2021). Organisational capabilities and project organising research. International Journal of Project Management, 39(5), 422-436. https://doi.org/10.1016/j.ijproman.2021.02.003
Machete, I. F., & Marques, R. C. (2023). Water supply and sanitation projects in the last decade: Project characteristics, multilateral development bank performance, and quality of results. Journal of Water, Sanitation and Hygiene for Development, 13(12), 986-1000.
https://doi.org/10.2166/washdev.2023.176
Ministry of Infrastructure (MININFRA). (2023). Water and sanitation sector annual report 2022/2023. Ministry of Infrastructure.
Mushayi, W., Dar, J., & Mpundu, M. (2025). An evaluation of RBM implementation in not-for-profit sector of Zimbabwe during COVID-19. African Evaluation Journal, 13(1), 1-11.
https://doi.org/10.4102/aej.v13i1.771
National Institute of Statistics of Rwanda (NISR). (2025). EICV7 thematic report: Utilities and amenities 2023/24. National Institute of Statistics of Rwanda.
OECD. (2021). Applying evaluation criteria thoughtfully. OECD Publishing.
https://doi.org/10.1787/543e84ed-en
Ongukah, J., & Otara, A. (2025). Leadership monitoring and evaluation reporting: Implications for infrastructure projects in public secondary schools. International Journal of Research in Education and Science, 11(1), 110-128.
https://doi.org/10.46328/ijres.3562
Ovcina, A., & Arslanagic-Kalajdzic, M. (2024). The role of monitoring and evaluation and project implementation management system for non-profit project performance in developing countries. South East European Journal of Economics and Business, 19(1), 63-76. https://doi.org/10.2478/jeb-2024-0005
https://doi.org/10.2478/jeb-2024-0005
Reynolds, M. (2024). Systems thinking principles for making change. Systems, 12(10), 437.
https://doi.org/10.3390/systems12100437
Rutikanga, O., & Gachili, W. (2024). Effect of monitoring and evaluation (M&E) practices on performance of health funded projects in Rwanda: A case of malaria control, maternal and child health programs of Ministry of Health. Journal of Entrepreneurship & Project Management, 8(3), 15-25.
https://doi.org/10.53819/81018102t2347
Schultz, T. W. (1961). Investment in human capital. The American Economic Review, 51(1), 1-17.
Tengan, C., Aigbavboa, C., & Thwala, W. D. (2021). Construction project monitoring and evaluation. Routledge.
https://doi.org/10.1201/9781003137979
Thambura, J. M., Mwangi, N., Mbugua, J., & Kikwatha, R. (2023). Monitoring and evaluation practices and performance of livelihood development programme: Case of Caritas Meru, Kenya. European Journal of Business and Management Research, 8(3), 82-88.
https://doi.org/10.24018/ejbmr.2023.8.3.1942
U.S. Government Accountability Office. (2023). Water infrastructure: Federal efforts to improve project performance. GAO.
Uwanyirigira, D. (2022). Assessment of monitoring and evaluation practices and project performance of NGOs in Rwanda. Braina Journal, 1(1), 1-5.
Uwibambe, L., & Njenga, G. (2025). Monitoring and evaluation practices and performance of the energy projects in Rwanda: A case of Electricity Access Rollout Programme (EARP). International Journal of Entrepreneurship and Project Management, 10(1), 1-25.
https://doi.org/10.47604/ijepm.3193
Vanessa, E. K., & Gitahi, N. (2023). Community participation in monitoring evaluation and project sustainability in Rwanda. Journal of Entrepreneurship & Project Management, 7(2), 93-112.
https://doi.org/10.53819/81018102t5167
Vogel, I. (2012). Review of the use of "theory of change" in international development. UK Department for International Development (DFID).
WASAC Group. (2025). Nyamagabe WASH program set to boost water access from 59% to full coverage. Water and Sanitation Corporation (WASAC Group).
Weiss, C. H. (1995). Nothing as practical as good theory: Exploring theory-based evaluation for comprehensive community initiatives for children and families. In J. P. Connell et al. (Eds.), New approaches to evaluating community initiatives: Concepts, methods, and contexts (pp. 65-92). Aspen Institute.
Téléchargements
Publié
Numéro
Rubrique
Licence
© Hagenimana Joseph, Dushimimana Jean de Dieu (Author) 2026

Cette œuvre est sous licence Creative Commons Attribution - Pas d'Utilisation Commerciale 4.0 International.